Campbell Elemtary Phase I and IIProject DescriptionCampbell Addition and Renovation - Phase I Project DescriptionThis project consists of a classroom addition and complete renovations of the existing Campbell Elementary School located adjacent to Raceland-Worthington High School. The single story classroom addition gross area, including new connecting corridor, is approximately 6,900 square feet. Major construction work of the classroom addition includes: • Conventional concrete footings and slab on grade • Masonry bearing walls and steel roof structure • Steel exterior and interior doors • Aluminum windows and storefront system • Lay-in acoustical ceilings • Wall and floor finishes • New restrooms • HVAC • Plumbing • Fire protection • Electrical and telecommunication systems Major renovation work in the existing school includes: • Reroofing of majority of existing roof with new low sloped EPDM roofing • Replacement of existing windows with energy efficient windows and glazing • Replacement of existing HVAC system • Replacement of existing lighting • New floor finishes • New lay-in acoustical ceilings • New fire protection (sprinkler) system • Updating of fire alarm and telecommunication systems.
Major Construction work on this project shall include on Phase II: Project Location550 Rams Blvd. ClientRaceland Worthington Independent Schools Architect |









